Nuclear Power Infrastructure

High-specification secondary cooling loop descaling and surface prep.

High-specification secondary cooling loop descaling and surface prep.

REGULATORY SPEC Strict Protocol Compliance
DECONTAMINATION Secondary Cooling Loops
SAFETY CLEARANCE Confined Space Level IV
READINESS Rapid Planned Outages
OPERATIONAL OVERVIEW & METHODOLOGY

Nuclear Power Generation Facilities

Secondary cooling loop descaling, forebay dredging, and ALARA-compliant surface preparation.

Nuclear generating stations demand uncompromising technical precision, rigorous radiological safety compliance, and flawless execution during planned outage critical-path windows.

Chow Marine provides specialized secondary-side decontamination, deep water intake clearing, and emergency response services designed in accordance with ALARA (As Low As Reasonably Achievable) radiation protection principles and nuclear quality assurance standards.

Our technicians undergo comprehensive background screening, nuclear security clearance, and specialized radiation protection training. We operate clean, closed-loop UHP systems that prevent cross-contamination in auxiliary buildings, heat exchanger bays, and turbine halls.

In offshore cooling water intakes on the Great Lakes, our teams perform remote ROV and diver-supported thermal water jetting to clear cooling channels of invasive biofouling without introducing foreign materials that could disrupt condenser vacuum efficiency.

STANDARD OPERATING PROCEDURE (SOP) PROTOCOL // 4-PHASE RIGOR
01

ALARA Planning & Pre-Brief

Pre-job dose estimation, micro-containment engineering, radiological zoning, and tool mock-up validation.

02

Secondary Loop Isolation

Installation of certified radiological barriers, HEPA air handling, and HEPA-filtered vacuum extraction lines.

03

Precision Decontamination

Low-volume, ultra-high pressure water jetting to eliminate fixed oxide layers and heavy scale with minimal secondary waste generation.

04

Health Physics Survey

Swipe testing, gamma spectroscopy confirmation, and release certification in full compliance with CNSC guidelines.

ENGINEERING SPECIFICATIONS MATRIX CALIBRATED FIELD DATA
Quality Standard CSA N285.0 / N299 Series
Dose Optimization ALARA Protocol 100%
Filtration Efficiency HEPA 99.97% @ 0.3 Microns
Intake Clearing ROV / Diver Hybrid
Security Status Fully Vetted / Cleared
FIELD DEPLOYMENT CASE PROFILE VERIFIED HARBOR LOG

Secondary Condenser Waterbox Decontamination Outage

CLIENT / SECTOR: Multi-Unit Nuclear Generating Facility — Lake Huron

Decontamination of 12 condenser waterboxes and intake forebay suction tunnels during scheduled unit overhaul.

OPERATIONAL OUTCOME: Delivered under budget with zero radiologically reportable events and zero safety incidents. Final dose was 22% below the ALARA planned target.
TECHNICAL FAQ FREQUENT INQUIRIES
01

Are your technicians certified to work inside Canadian nuclear facilities?

add

Yes. Our specialized nuclear outage teams maintain active nuclear security clearances, complete pre-job training at site mock-ups, and operate under the oversight of station Health Physics personnel.

02

How is contaminated wastewater managed during nuclear decontamination?

add

All effluent is routed through dedicated multi-stage ion-exchange filtration and sealed holding tanks, ensuring zero unmonitored discharge into station drains.

03

What experience do you have with Great Lakes nuclear cooling water intakes?

add

We have over a decade of specialized experience servicing offshore intake structures, velocity caps, and travelling screens across the Great Lakes basin.

Nuclear Power Generation Facilities
CHOW MARINE INDUSTRIAL RIG HAMILTON HARBOR // 24/7 ACTIVE READINESS
MISSION COORDINATION & DISPATCH

Ready To Mobilize Crew & Tooling?

Connect directly with our Hamilton operations superintendent for emergency rapid mobilization, site evaluation, and firm engineering proposals.